Master these 10 processes to sharpen your project management skills

Small projects don’t necessarily require much knowledge of project management or much project management discipline. But as a project gets larger, formal processes and techniques become essential. Different project management methodologies organize and structure these processes in various ways, but we’re going to focus on 10 basic areas(Sony VAIO VGN-FZ15G Battery):

Define the project

Plan the work

Manage the workplan

Manage issues

Manage scope

Manage risks

Manage communication

Manage documentation

Manage quality

Manage metrics

In general, if you can master these areas, you can succeed in most projects. You may not have to worry about managing documentation or metrics on a small project, but the larger your project, the more you’ll need to focus on all 10 processes(Sony VAIO VGN-FZ15T Battery).

Notice that our list doesn’t include analysis, design, testing, or implementation. Those who have worked on projects probably know that they typically include analysis and testing. However, there is a major distinction to be made. Analysis and testing are part of the actual project work effort (also called a project lifecycle) (SONY VGP-BPS13/B Battery). These phases change depending on the project type. If you have a full lifecycle project, you could perform the full range of analysis, design, construction, testing, and implementation. On other projects, you might do only certain components. For example, if you were performing a research and development project, you wouldn’t be doing implementation. If you were performing a study, the project might end after the analysis phase(Dell INSPIRON 1764 battery).

Do you see something missing?

Two processes are sometimes included as a part of basic project management: people management and contract and procurement management. People management is an important skill for project managers, but it’s not specific to project management(Dell INSPIRON 1564 battery). After all, any management-subordinate relationship requires people management. The distinction is that it’s a project “manager” skill, but not necessarily a project “management” skill(Dell INSPIRON 1464 battery).

We’ve also excluded contract and procurement management from our list. In most organizations, project managers need to know about the management of contracts and vendors, but they aren’t responsible for it. A legal department and/or procurement department is usually responsible for these disciplines(Dell INSPIRON E1505 battery).

Timing and sequencing of the processes

Except for the first two categories — defining the project and planning the work — the 10 major project management areas don’t fall into a sequential path. Processes 3 through 10 can be done in any order, and in fact, are done in a parallel and ongoing manner throughout the project(Dell INSPIRON 1525 battery). For example, if a major problem pops up, you must use issues management regardless of what other aspects of project management you’re using before, during, or after that time. Let’s take a closer look at each process(ASUS EEE PC900 battery).

1: Define the project

As the project manager, you must make sure that the work is properly understood and agreed to by the project sponsor and key stakeholders before the project work begins. You’ll work with the sponsor and stakeholders to ensure that the project team and the client have common perceptions of what the project will deliver, when it will be complete, what it will cost, who will do the work, how the work will be completed, and what the benefits will be(SONY VGP-BPS13B/B Battery).

The larger the project, the more important it is that this information is mapped out formally and explicitly. All projects should start with this type of upfront planning to prevent problems caused by differing viewpoints on the basic terms of the project. The major deliverable from this step is the Project Definition (some companies call this a Project Charter) (SONY VGP-BPS13 Battery).

At a high level, the purpose of defining the work includes:

Understanding and gaining agreement on project objectives, deliverables, scope, risk, cost, approach, etc. This is the most important part of defining the work and is where most of the time is spent in gaining common agreement(HP PAVILION DV6000 battery).

Determining whether the original business case is still valid. For example, a project that requires 10,000 effort hours might make business sense. If the more detailed definition process results in a more refined estimate of 20,000 hours, the project may no longer be feasible(SONY VAIO VGN-FZ31B Battery).

Making sure the resources you need are available when you need them.

Providing a high-level baseline from which progress can be compared and scope can be controlled(SONY VAIO VGN-FZ31M Battery).

Gaining agreement with the client on the processes used to manage the project.

The effort required to define the work depends on the amount of information and the level of detail that need to be understood and documented. The duration required to define the work depends on the length of time necessary to discover and document the information, as well as the time required to gain agreement and approval from the clien(SONY VAIO VGN-FZ31J Battery)t.

It may be difficult to define exactly what the final deliverables look like for large and complex projects. It is also difficult to estimate the total cost and deadline date. If that is the case, you can break the project into smaller projects. The projects that are done first should then be much easier to define. The projects that are to be completed in the future can be defined in detail as they get closer to execution(SONY VAIO VGN-FZ31E Battery).

At the end of the definition aspect, you should have a Project Definition that defines the expectations of the project in terms of objectives, deliverables, scope, risks, costs, deadline, and roles. This document should be formally approved by the project sponsor and other key stakeholders before the project team proceeds(Sony Vaio VGN-FZ31S battery). At times, you can get frustrated because of the difficulty in gaining agreement with the client on scope, timeline, and cost. But that is exactly the reason this definition work is done ahead of time. Think of the problems you would no doubt encounter trying to gain agreement with the client on scope, schedule, or cost when the work had started and the deliverables were actually being produced(SONY VAIO VGN-FZ31z Battery).

2: Plan the work

When you define the project, you make sure that you have an agreement with the project sponsor on what work should be completed in this project. In this stage, you determine how the work will be completed. This involves building the Project Workplan. You’ll take different approaches according to the size of the project(SONY VAIO VGN-FZ38M Battery). For example, the workplan for small projects can be built using a project management package like Microsoft Project, a spreadsheet, or even a piece of paper.

If you don’t have a workplan template to use as your starting point, you can use the Work Breakdown Structure (WBS) (SONY VAIO VGN-FZ210CE Battery), a technique for looking at the project at a high level and breaking the work into smaller and smaller pieces until you can get the full picture of the work. The entire team can collaborate on this exercise. I recommend breaking down the work into lower levels until each remaining activity is less than 80 hours, and it is clear what is required to complete the activity(SONY VAIO VGN-FZ160 Battery).

Once all of the work has been uncovered, you can sequence the activities and identify dependencies between them. At this point, the WBS has been converted to a Network Diagram(SONY VAIO VGN-FZ21 Battery).

Next, you add resources (workers) for each activity. If you know of certain resources, you can add them by name. If not, you can use generic names as placeholders. You then add the effort hours and the beginning and ending dates for each activity(SONY VAIO VGN-FZ21m Battery).

Your workplan is now ready to go. You’ll know what work you have to complete (Project Definition) and how you’ll get the work done (Project Workplan).

The relationship between defining and planning the project

You may find that you can’t complete the Project Definition without starting to lay out the overall Project Workplan. In many cases, you’ll need to work on these two deliverables simultaneously(SONY VAIO VGN-FZ18m Battery). As you gather information about scope and deliverables, you’ll need to start laying out a timeline so that you can get your hands around estimated effort and duration. When the deliverables, scope, assumptions, and approach are complete, you should have enough information in the Project Workplan to estimate the budget, effort, and duration, which you’ll use in turn to complete the Project Definition(SONY VAIO VGN-FZ11m Battery).

3: Manage the workplan

At this point, you’ve finished defining the project and planning the work. The major deliverables in place are the Project Definition and Project Workplan. Some project managers think that defining and planning the work means that the hard part of managing the project is behind them. That is definitely not the case(SONY VAIO VGN-FZ11z Battery).

You’ll never be a successful project manager if you don’t keep the workplan up to date. Remember, the workplan is only a deliverable. It describes the work that needs to occur, the order of the work, how much effort is required, and who is assigned, but it represents only your best guess as to how to complete the remaining work at any particular point in the project(SONY VAIO VGN-FZ11l Battery).

The more complex your project is, the more change is going to be required in your workplan over time. As the project manager, you must evaluate the workplan on an ongoing basis (perhaps weekly) and determine the current state of the project(SONY VAIO VGN-FZ140E Battery).

During this weekly review, you’ll update the workplan with the current state of work that is completed and in progress. You’ll evaluate the remaining work to see if the project will be completed within the original effort, cost, and duration plans. If it can, you are in good shape. If it can’t, you must implement corrective action(SONY VAIO VGN-FZ150E Battery).

Of all of the skills of managing the project, this one is perhaps the most fundamental. Depending on the dynamics of your project, you may be in the position of having to constantly use your experience and creativity to get the project completed within expectations. One week, your project may be on track. The next week, you may have work assignments that are late and issues that have surfaced(SONY VAIO VGN-FZ190 Battery).

If an activity on the critical path is a week late, you can’t sit idly and allow the entire project to be a week late. Instead, you must evaluate the resources and options available and get the project back on track. If you’re good at it, managing the workplan can be one of the more challenging and rewarding aspects of project management. If you don’t relish the detailed work that is required, you may find it much more difficult to be successful(SONY VAIO VGN-FZ460E Battery).

4: Manage issues

An “issue” arises when a problem will impede the progress of the project and can’t be resolved by the project manager and project team without outside help. If a major problem emerges, you have no choice but to resolve it. The only question is whether you’ll actively apply issues management to the situation or flounder through indecision and uncertainty about how the issue should be resolved(SONY VAIO VGN-FZ440N Battery).

Issues management has two major components. The first is having a process to uncover issues, determine their impact on the project, examine alternatives, and bring in people to make the best decision under the circumstances. This is all part of the project management procedures that should be defined and agreed to ahead of time. These procedures ensure that issues are recognized and resolved as quickly as possible(SONY VAIO VGN-FZ32 Battery).

The second component of issues management is applying specific problem-solving techniques. This includes some understanding of techniques such as Fishbone diagrams, Pareto charts, and root cause analysis. Having an understanding of one or more of these techniques allows you and your team to understand the nature and cause of the problem, what options are available, and what alternative would be the best course of action(sony vgp-bpl9 battery).

One important thing that all project managers discover is that having a process to resolve issues doesn’t mean you’ll successfully resolve every one. Sometimes, there are great alternatives to issues and your job is to help discover the best one. In other instances, there is no good resolution to a major problem(SONY vgp-bps9 battery). On occasion, your final choice is to pick the solution that causes the least harm or is the best among poor choices. Still, your issues resolution process and your problem-solving techniques will allow you to determine what options are available so that you at least understand the repercussions(SONY VAIO VGN-FZ11S Battery).

5: Manage scope

Scope describes the boundaries of the project and defines what the project will deliver, what data is needed, and which organizations are affected. Given a set of resources and time, an infinite number of things can be delivered(SONY VAIO VGN-FZ Battery).

Scope change management starts with scope change definition. If the project manager hasn’t done a good job defining scope, it will be difficult to manage scope during the project. The purpose of scope change management is to protect the viability of the current, approved Project Definition(SONY VGP-BPS8 battery). When the project was defined, certain expectations were set for what the project was going to produce for a certain cost and in a certain timeframe. Both you and the project sponsor have those expectations in mind when the Project Definition is developed and approved(Sony PCGA-BP2EA battery).

During the life of a project, there may be a need for items that are different from, or not included in, the original Project Definition; this is to be expected. If this occurs, the client should not expect that these items can be delivered using the previously agreed on resource and time constraints. The project team will identify the new requirements and determine the impact to the project if the new requirements are included. The information is then taken to the sponsor for approval(Sony VGP-BPS13/B battery).

Remember, the sponsor is the one who approved the funding of the work to begin with. Therefore, he or she is the one who should approve any changes to the original agreement. If the business value of the change is high enough, the sponsor should approve adding the new requirement to the project, as well as the incremental budget and timeline needed to complete the work. Everyone will then be in agreement and everyone’s expectations will have been reset(Sony VGP-BPS13/S battery).

Of course, sometimes it doesn’t happen so smoothly. Common problems include:

Scope creep. Large scope changes are easy to spot. However, when the changes are small, sometimes you find that you’re including them without realizing it. Scope creep means that you’re accepting small changes that end up having a significant cumulative effect on the project. You and the entire team must be diligent to guard for all scope changes — big and small(Sony VGP-BPS13A/B battery).

End-user scope approval. The project sponsor is the person paying for the project. However, once the project begins, the team spends more time with lower-level clients and end users. Some project team members believe that scope changes are fine if the end user approves them. This is not the case(Sony VGP-BPS13B/B battery). Unless the sponsor has specifically delegated the approval authority, these people can’t approve scope changes. They can raise scope change requests, but only the sponsor has the funding authorization to approve incremental work(Sony VGN-FZ11E battery).

Team members not being accountable. A common cause of missing deadlines is that the team members end up doing more work than required. For example, a team member may be asked to create a report. As he or she is creating it, the client asks for new information. The team member tries to accommodate the client, and the work ends up being late. This happens when team members think that only the project manager needs to worry about scope change management(Sony VGN-FZ32 battery). They need to understand that it’s everyone’s responsibility.

The root cause of many unsuccessful projects is poor scope change management. Defining and managing scope effectively will increase the chances that your project will meet expectations(Sony VGN-FZ440N battery).

6: Manage risk

Risk refers to future conditions or circumstances that exist outside the control of the project team and that will have an adverse impact on the project if they occur. In other words, whereas an issue is a current problem that must be dealt with, a risk is a potential problem. Reactive project managers resolve issues when they arise. Proactive project managers try to identify and resolve potential problems before they occur. This is the science and art of risk management(Sony VGN-FZ38 battery).

Since smaller projects usually don’t have long durations, there is less opportunity for problems to develop. Larger projects usually have risks lurking just over the horizon. Risk management involves identifying all potential risks to the project, determining how likely they are to occur, and understanding the impact on the project if they occur(Sony VGN-FZ37 battery).

With that information, the project team can determine which risks should be actively managed. For example, a risk with a high probability of occurring and a large impact on the project should definitely be managed proactively. On the other hand, a risk that has a high likelihood of occurring but a marginal impact on the project can probably be ignored(Sony VGN-FZ35 battery).

Once you identify which risks you want to actively manage, you can invoke five general responses:

Leave it. You would leave a risk if you determined that your project would not be harmed if the risk occurred or if there was nothing that could be done to address the risk and you’re willing to take the chance that it won’t occur(Sony VGN-FZ32B battery).

Monitor the risk. In this case, you don’t proactively mitigate the risk but you monitor it to see whether it’s more or less likely to occur as time goes on. If it looks more likely to occur later, the team must address it at that time(Sony Vaio VGN-FZ21J battery) .

Avoid the risk: Avoiding the risk means eliminating the condition that’s causing the problem. For example, risks associated with a particular vendor might be avoided if another vendor is used(Sony VGN-FZ62B battery).

Move the risk: In some instances, the responsibility for managing a risk can be removed from the project by assigning the risk to another entity or third party.

Mitigate the risk: In most situations, this is the approach to take. If a risk has been identified and is a concern, you can develop a proactive plan to ensure that it doesn’t occur(Sony Vaio VGN-FZ31J battery ).

As with scope changes, there is nothing inherently wrong with having risks on a project. Clients don’t expect that a project will be risk-free. What matters is the project management response. If risks are identified and actively managed, the project has a much better chance of success. If risks are ignored, the project will be negatively affected when the risks turn into issues. At that time, there may be fewer options for resolution without impacting the project(Sony Vaio VGN-FZ31B battery).

7: Manage communication

Properly communicating on a project is critical for managing the clients and the shareholders. If they’re not kept well informed of the project progress, there is a much greater chance of problems and difficulties due to differing expectation levels. In fact, in many cases when conflicts arise, it’s not because of the actual problem, but because the client or manager was surprised(Sony VGN-FW11M battery).

There are two levels of communicating on projects. First, all projects should communicate status. Second, if your project is larger, more complex, or more politically charged, you need a higher and more sophisticated level of communication defined in a Communication Plan(Sony VGN-FW11 battery).

Status meetings and status reports

All projects need effective communication from the project team to the project manager and from the project manager to the rest of the stakeholders. Status reports and status meetings need to do more than just say whether the project is on track. This is the time you communicate everything you think needs to be known about your project(Sony Vaio VGN-FZ18S battery). You communicate about adherence to the project’s budget and schedule, accomplishments from the last reporting period, planned accomplishments for the next period, new risks, current issues, and current scope change requests(Sony VGN-FZ11L battery).

The information and presentation must be communicated with the audience in mind. Therefore, you would expect that a weekly status meeting with your team would include discussions at a fairly low and detailed level. Status reports you send to the sponsor and management stakeholders will necessarily be brief and high-level(Sony Vaio VGN-FZ38M battery).

Communication Plan

Large initiatives, especially the kind that require organizational change, must include an overall Communication Plan that takes a multifaceted approach to communication. The process for building this plan includes defining all your stakeholders, determining what information they need, brainstorming ways to deliver that information, and then deciding on a set of communications that cover as many stakeholders as possible in the most resource-efficient manner(Sony VGN-FZ11M battery).

Depending on the audience, the communication falls into one of three areas.

Mandatory. This includes status reports, budget reports, and legal and auditing requirements.

Informational. This is communication that provides extended information for people with a need to know more. Examples include a document library, frequently asked questions (FAQ), and a project Web site that contains relevant project information(Sony VGN-FZ11Z battery).

Marketing. This is communication designed to build enthusiasm for your project. Examples include publishing success stories, building a positive image, distributing management testimonials, and using a project logo(Sony Vaio VGN-FZ31M battery).

Communication must be handled proactively by the project manager and must be planned and executed with a purpose in mind. If you communicate effectively and proactively, you’ll find that the entire project runs more smoothly and with less conflict and frustration(Sony VGN-FZ220E battery).

8: Manage documents

Many project managers take document management for granted until they’re inundated with hundreds of documents. It’s better to estimate the volume of project and project management documentation you think the project will produce, establish the proper processes and rules to organize the documentation, and then manage the documentation during the project to ensure that it doesn’t get out of control(Sony VGN-FZ29VN battery).

Project managers on smaller projects don’t need to give as much thought to managing documentation. As projects get larger, the documentation definitively needs to be actively managed. Problems at their simplest include documentation that gets lost or is hard to find and work that ends up being duplicated. At its worst, document versions get out of order, document updates get over-posted and lost, and confusion and uncertainty reign(Sony VGN-FZ290 battery).

This is an aspect of project management that may be supported by a tool, such as a document repository. However, tools can be just as confusing if proper techniques aren’t used to store documents in a manner that allows them to be easily retrieved(Sony VGP-BPL12 battery).

Document management involves simple and complex tasks. A simple activity, for example, is a document-naming convention. If you have 10 people on your team and each one submits a status report each week, it’s not long before you have hundreds of documents. It’s easier to organize the documents if everyone uses a common naming convention. Should the name of the document start with each person’s name? If so, then each person’s historical status reports will sort together and be easier to find(Sony VGP-BPS15 battery).

Or perhaps you’ll want to search for status reports from particular points in time. In that case, the status reports should start with the date. Then all the status reports for a particular reporting cycle will sort together(Sony VGP-BPS18 battery).

Another part of document management is understanding the types of document tools you’ll use. For example, you might define Microsoft Word as your standard document editor. If your team is cross-functional and includes clients, vendors, and suppliers, these types of document management rules become more vital(Sony VGN-FZ17 battery).

Other factors must be considered to successfully manage documents. These include where you’ll store the documents, how they’ll be organized, access and security rules, keywords/indexing, naming standards, versioning, completion status, retention/purging, backups, and standard template formats(Sony VGN-FZ17G battery).

9: Manage quality

Quality is represented by how close the project and deliverables come to meeting the client’s requirements and expectations. In other words, quality is ultimately measured by the client(Sony VGN-FZ17L battery).

The project team should strive to meet or exceed the client’s requirements and expectations. Sometimes there is a tendency to think that “quality” means the best material and equipment and zero defects. However, in most cases, the client doesn’t expect, and can’t afford, a perfect solution. If there are just a few bumps in the project, the client can still say that the project delivered to a high level of quality(Sony VGN-FZ11S battery).

On the other hand, a flawlessly designed, defect-free solution that doesn’t meet the client’s needs isn’t considered high quality. The purpose of the quality management step is to first understand the expectations of the client in terms of quality and then put a plan and process in place to meet or exceed those expectations(Sony VGP-BPS14 battery).

Because quality is defined by the client, it may seem that it is completely subjective. However, plenty about quality can be objective. This requires first breaking down the generic term of “quality” into a number of areas that define the characteristics of quality(Sony Vaio VGN-FZ18G battery).

For example, you can think of a quality computer application in terms of response time, look-and-feel, ease of understanding, level of help documentation, and absence of defects. Once you’ve defined the more tangible characteristics of quality, you can look at each of them to determine how they can be measured with more objectivity(Sony VGN-FZ15M battery).

Quality management is not an event: It is a process and a mindset. A consistently high-quality product can’t be produced by a faulty process. You need a repetitive cycle of measuring quality and updating processes(Sony VGN-FZ160E battery).

Collecting metrics is vital to making the quality management process work. So, the ninth and tenth aspects of project management, managing quality and managing metrics, are closely tied. If you want to do a good job of managing quality, you must measure(Sony VGN-FZ18E battery).

When the project is initially defined, the project team must understand the expectations of the client in terms of quality and plan the activities to meet those expectations in a Quality Plan. The Quality Plan contains completeness and correctness criteria so that the project team knows what the quality expectations are(Sony VGN-FZ180E battery).

The Quality Plan also contains the two general quality processes: quality control and quality assurance. Quality control activities ensure the deliverables produced by the project meet client expectations. An example of a quality control activity is an inspection of each component that will be used to complete a final deliverable(Sony VGN-FZ340E battery). Quality assurance activities ensure that the processes used to create the deliverables are of high quality. An example of a quality assurance technique is a checklist that contains all of the steps that a deliverable must complete before it reaches final acceptance(Sony VGN-FZ31E battery).

One of the purposes of quality management is to find errors and defects as early in the project as possible. Therefore, a good quality management process will end up taking more effort hours and cost up-front in the project. However, focusing on quality early has a large payback as the project progresses. For example, it is much more efficient to spot problems with the business requirements during the analysis phase of the project than to redo work to add missing requirements during the product testing(Sony VGN-FZ61B battery). It’s also much cheaper to find a problem with, for example, a computer chip when the chip is manufactured than to replace it when a client brings the product in for service after a purchase(Sony Vaio VGN-FZ18M battery).

10: Manage metrics

Gathering metrics on a project is the most sophisticated project management process and can be the hardest. Because metrics can be difficult to define and collect, they’re usually ignored or handled poorly. All projects should be gathering basic metric information regarding cost, effort, and cycle time. However(Sony VGN-FZ15 battery), you must also collect metrics that determine how well the deliverables satisfy the client’s expectations and how well the internal project delivery processes are working. Depending on the results, you can undertake corrective action or process improvement activities to make the processes more efficient and effective(Sony VGN-FZ150E battery).

Managing metrics and managing quality are related. It is difficult to improve the quality of your deliverables or your processes if you’re not gathering metrics. Metrics are used to give some indication of what the beginning state of quality is and whether quality is increasing or decreasing(Sony VGP-BPS13 battery).

Many metrics can be gathered on a project. The project team should identify and collect a balanced set that provides the most value. To determine the right metrics for your project, you:

Identify the project success criteria in terms of product deliverables and project execution. That is, determine what your deliverables need to look like for the project to be successful. Also determine how your project needs to be completed to be considered successful-for example, budget and deadline expectations(Sony VGP-BPS10 battery).

Brainstorm a set of metrics that provides an indication of the state of each success criterion.

Look for a balanced set of metrics that provides indications of success in terms of cost, delivery, quality, and client satisfaction(Dell RM791 battery).

Prioritize the potential metrics to come up with a list that provides the most value in the most cost-effective manner.

Set targets to allow you to determine success. Metrics are rarely of value alone. The value comes in measuring where you are against a preferred state or agreed on target.

Add collection activities to the workplan to ensure that people are responsible for the metric collection and analysis process(Dell Inspiron 6000 battery).

In general, metrics management is of less value on smaller projects because there isn’t enough time to capture the data, analyze the results, and make appropriate process improvement changes. Longer projects give you time to use a feedback loop. The most value is gained if the metrics are used to drive improvements on an organization-wide basis(Dell Vostro 1710 battery).

Friday, December 3, 2010

10 ways IT wastes money on development

Many IT departments walk a fine line between being a needed cost center, a necessary evil, and an absolute money pit. In a few rare occasions, they’re able to deliver enough value to become profit centers(Sony Vaio VGN-FZ battery).

One of the key factors in determining whether an IT department is delivering ROI has to do with the development efforts occurring within that department. Here are 10 of the most common ways IT departments waste money on development(SONY VAIO VGN-FZ4000 Battery).

1: Communication problems

Communication issues are one of the biggest causes of project failure. These issues are magnified with internal projects. Just because the “customer” works in the same building and has their paychecks signed by the same person as you doesn’t mean there won’t be communication problems(Sony VGP-BPS13 battery). In fact, internally facing projects are often worse than projects for paying customers because internal customers don’t have to adhere to a contract, and no tangible value is placed upon the work(Sony VGN-FZ150E battery).

In these situations, there is little incentive for the customers to work well with you, and if communication breaks down, they complain about how “IT is stonewalling us.” The result is wasted time and money due to things being delivered late, delivered wrong, or not delivered at all(Sony Vaio VGN-FZ18M battery).

2: Process issues

To the rest of the company, internal IT is like the nephew you can order to come mow the lawn when needed. This is no way to run development projects. All too often, the IT department eventually tires of it, tries to establish some sort of process to put on the brakes, and gets initial buy-in from leadership(Sony VGN-FZ61B battery). Then, when the other departments think “IT is stonewalling us,” leadership changes course and rescinds their buy-in without telling IT. The next thing you know, every minor meeting becomes a shouting match about who is adhering to what process or how the process is not working — even though the meeting might be about the feature list. Broken, ineffective, and unenforced processes are a major waste of time and money(Sony VGN-FZ180E battery).

3: Refusal to go live and iterate (aka: insistence upon perfection)

How many times have you seen a project that is 99% done not get deployed because one of the customers isn’t 100% happy with it? And then from there, it seems like you spend almost as much time tweaking a few minor issues as you did building the application in the first place(Sony VGP-BPS14 battery).

This is where I am in 100% agreement with the Agile folks. If the project is even 90% complete, go ahead and deploy it. You know there are a few bugs and that some things are not “just so,” but that’s okay. Get actual users to work with it(Sony VGN-FZ11S battery). Who knows? Maybe they’ll like it as is, or maybe they’ll have ideas that are even better than the features that were not delivered. But no matter what, having an application mostly done and not deployed means that it’s going to take even longer to see ROI on it(Sony VGP-BPS18 battery).

4: Penny wise, pound foolish

All too often, leadership doesn’t think that it’s worth investing money in internal IT development projects. Their thinking goes something like this: “We won’t see revenue from it, so how can we see ROI?” Well, if the project won’t deliver value, why do it at all? As many mothers have told their children through the ages, “If something is worth doing, it’s worth doing right(Sony VGP-BPS15 battery).”

This doesn’t mean that every developer needs a dual CPU desktop machine with a pair of 30-inch displays, cable TV with all of the premium channels, and a chauffeur so they can write code on their morning commute. But it does mean that if a developer needs a tool and can demonstrate that need, it should be bought(Sony VGN-FZ290 battery). I can’t count the number of times I’ve seen a developer with a $70,000/year salary spend three weeks doing something by hand that could have been done in a few hours with a $1,000 tool. Yeah, that was a great way to “save” money, wasn’t it(Sony VGN-FZ220E battery)?

5: Outsourcing missteps

Everyone loves to knock outsourcing, regardless of whether it’s contractors working onsite or offshore workers halfway around the globe. But the leadership team likes looking at the spreadsheet numbers on outsourcing, particularly when times are tight like they are now. The problem is, outsourcing often costs much more than it saves because it’s filled with hidden expenses(Sony VGN-FZ11Z battery).

For example, when you bring in contractors through a staffing agency, how do you think the agency finds workers of a particular skill level, charges you less than it would cost you to hire them directly, pays their overhead (such as that well-dressed salesperson and their recruiting department), and makes a profit(Sony VGN-FZ11M battery)? Easy — they misrepresent the talent. Oftentimes, the staffing agency doesn’t have superstars “on the bench” waiting for the next hot assignment, they run an ad on a job board and fill your seats with the cheapest people they can get on two weeks’ notice. Anyone sitting around in the job pool just waiting to fill that position is probably not a choice employee(Sony Vaio VGN-FZ31M battery).

Offshore workers are an entirely different issue; it’s extraordinarily difficult to manage a project that’s developed offshore. Chances are, you’ll need at least one employee for every couple of your offshore workers just to manage them and keep track of what’s happening. You might assume time zone, cultural, and language difficulties would be small problems, but they aren’t. Just try to do your job efficiently when you need to wake people up if you want to talk to them after 1:00 PM(Sony Vaio VGN-FZ31Z battery).

I’m not saying that outsourcing is always a losing proposition. But a hastily thrown together outsourcing plan is a great way to throw tons of money down the drain and lose a lot of time in the process(Sony Vaio VGN-FZ38M battery).

6: “The Longest Yard” (documentation and user training)

While issue #3 (refusal to go live and iterate) keeps the product from ever reaching the users, what happens if the users never get documentation or training? Unless your application is as easy to use as, say, a phone book, it’s unlikely anyone will ever use it(Sony Vaio VGN-FZ31S battery). Unused applications are the biggest waste of time and money possible because you went through the whole development cycle for nothing. You could have paid your team to sit at home playing video games and have gotten the same results(Sony VGN-FZ11L battery).

If your project plan doesn’t provide the chance to put together documentation, or if no one has put together a training program, you might as well take your development budget and use the cash to light the BBQ grill(Sony VGN-FZ15G battery).

7: Developers used as support staff

If you ever worked support, do you remember what you earned? Now, are you earning a multiple of that income as a developer? Same here(Sony VGN-FZ190 battery).

Developers are extremely expensive compared to support staff. Not only are the salaries higher, but the tools, training, etc., are too. The support team will need to work closely with development, especially for a new product. But developers should not be used as support staff unless the project is very small and/or bug free and self explanatory — it’s just too expensive(Sony Vaio VGN-FZ21S battery).

8: Poor foundation for development

Many companies aren’t set up well for development, especially if there are only a few developers on staff. There is a lot more to working on code than having a standard desktop PC with an IDE installed and a few books on the desk(Sony Vaio VGN-FZ18S battery).

There should be version control systems and bug tracking applications for all but the smallest of shops, for example. Developers will probably need additional support from IT, such as test machines (physical or virtual), database servers isolated from the production servers, and maybe a section of the network set aside to contain disasters if needed(Sony VGN-FW11 battery).

When developers don’t have the necessary resources to work safely and effectively, their work is slowed down, or it affects the rest of the company in negative ways. Think about it… if a developer’s faulty test code blows up a database server, wouldn’t you rather it didn’t blow up the one that the accounting system is also running on(Sony VGN-FW11M battery)?

9: Failure to know the business

Internal developers should know enough about the business so they can follow along without needing every little thing explained to them, and the customers should know enough about their own work so that they can actually explain it. All too often, someone realizes halfway through the requirements gathering process that the customer doesn’t know their own process(Sony Vaio VGN-FZ31B battery). It’s even worse when the project is given to the customer for review, and they say, “We don’t work this way; why does this application work this way?” And then you show them the specification they signed off on, and they say, “Well, we thought we did things that way, but we really don’t.” What a colossal waste of time and money(Sony Vaio VGN-FZ31J battery )!

As soon as it’s clear that the customer doesn’t really know their own process, you should stop development and tell them they need to figure out what they do before you can continue. Also, remind the customer that you’re a developer not a process engineer, so you’re not going to help them figure out their process(Sony VGN-FZ62B battery).

10: Neglecting to calculate project ROI

There is a fundamental flaw with many IT development projects: No one tried to calculate ROI before giving the go-ahead. Yes, ROI calculations tend to be overly optimistic and difficult to get right (or even close to right), even after the project is in production. Yet some projects are clearly a waste of money(Sony Vaio VGN-FZ21J battery) .

Think of how much time you need to save a department of $10/hour administrative personnel before it pays to have a $60,000/year developer devote three months to writing code. Sure, if it saves those personnel 10 minutes a day, and you have 50 of them on staff, the project makes sense(Sony VGN-FZ11E battery). But if it merely replaces a well-organized and well-understood filing cabinet and saves three workers two minutes a day, the project shouldn’t even be considered without a strong external reason behind it (such as a legal or a customer requirement) (Sony VGP-BPS13B/B battery).

There is nothing dumber than throwing away good money on a project that is guaranteed to not have any payoff.

Thursday, December 2, 2010

10 tips for writing a job-winning developer resume

As seasoned job hunters know, the first step on the road to finding work is to write a resume that gets you the interview. Unfortunately, some of the traditional resume writing rules just do not work well in the software development industry. Here are 10 tips for writing a programmer resume that will increase your chances of getting the interview(SONY VAIO VGN-FZ Battery).

1: Provide a skills list up front

The hiring manager wants to know if you have the skills the company is looking for. An “experience” section gives managers a good idea of how much experience you have, but if you have a “skills” section at the top of the resume, their eyes go there first(SONY VAIO VGN-FZ11S Battery). Sure, you may be making it a bit easier for them to weed out your resume. But on the flip side, you might bring to their attention some skills they would otherwise overlook. At the very least, the hiring manager will appreciate the skills list(SONY vgp-bps9 battery).

2: Make the experience interesting

Most developers on the market have written a data-driven Web site or desktop application. To give a bunch of examples of these on your resume is not impressive. What does impress a potential employer is experience that has something unique about it, showing you’ve done more than just “Hello World” level work(sony vgp-bpl9 battery). If you’ve been working under unique constraints or in environments with high levels of transactions or zero tolerance for failure, that looks very good to the person reading the resume. So show me how your experience is different, and I will see you as different(SONY VAIO VGN-FZ32 Battery).

3: Root out grammar, spelling, and other common mistakes

Over the course of my time hiring, I have seen all sorts of grammar and spelling mistakes on resumes. One of the most embarrassing was when someone misspelled the name of the college he graduated from(SONY VAIO VGN-FZ190 Battery). Resumes do contain some unique grammatical conventions, and software development work in particular often revolves around acronyms or oddly spelled words. But that is really no excuse. Check your spelling and your grammar. This tip appears on just about every resume advice article I have ever read, but it clearly needs repeating(SONY VAIO VGN-FZ150E Battery).

4: Education counts, but not for much

Unless you are just entering the job market for programming or are applying for a very specialized position, your education is not terribly important. Sure, you need to put it on your resume, but list it last, please. The hiring managers who need or want to know about it can find it, and the others won’t have to spend time on it(SONY VAIO VGN-FZ11l Battery). The world of programming changes often enough so that somewhere around seven years later, most schooling (except for “principles and theory” subjects, like mathematics or “pure” computer science) and certifications have little in common with the current working world reality(SONY VAIO VGN-FZ11z Battery).

5: Get to the meat, quick

The traditional resume format includes a lot of information that’s just not needed, in the mind of the development manager. Your summary and possibly even the objective are two such sections(SONY VAIO VGN-FZ11m Battery). There really is no way to provide a summary that describes most programming pros in a way that is accurate, yet shorter than a resume itself. This is why most summary sections read like so much useless drivel: “Seasoned programmer with 10 years development,” followed by highlights of the skills section. Thanks, but no thanks(SONY VAIO VGN-FZ18m Battery).

The objective is often (but not always) just as useless. If you are looking for a change of pace, it offers a great way to keep the reader from pigeonholing you based on your skills and experience(SONY VAIO VGN-FZ21m Battery). The intermediate programmer looking to slide into a senior developer position can safely skip the objective. The senior programmer who wants to become a software architect or a DBA needs to state an objective. So avoid the summary at all costs, provide only useful objectives, and let the reader get to your skill set as quickly as possible(SONY VAIO VGN-FZ21 Battery).

6: Formatting matters

The formatting of your resume is important. While the days of mailing resumes printed on premium stationery are long past, it is still a document that someone needs to read on a computer screen and on paper. That can be quite a balancing act, believe it or not. This is not the time to show off your inner Picasso, unless the position you are applying for is of a visually artistic nature(SONY VAIO VGN-FZ210CE Battery). This is the time to enhance readability. That means using a larger font (10 to 12 points), a common font that all computers have (if your document format does not bundle fonts within it), and one that looks good both on the screen and off. My recommendations are Verdana, Arial, Tahoma, Calibri, and Helvetica(SONY VAIO VGN-FZ38M Battery).

Use enough whitespace so that the document does not seem too dense, which will turn readers off. At the same time, don’t waste so much space that it takes eight pages to print 200 words. Of course, the format of the file itself is important(SONY VAIO VGN-FZ31z Battery). My experience has been that 99.9% of the recruiters out there will ask for your resume in Microsoft Word format if you send it in any other format, so make sure that you can provide a document in the standard .doc format(Sony Vaio VGN-FZ31S battery).

Always keep in mind that the resume is your primary tool for selling yourself. If readers can’t consume the information in it, whether due to technical issues or readability problems, they will quickly move on to the next resume(SONY VAIO VGN-FZ31E Battery).

7: Be cautious with the length

Regardless of how your document is formatted, try to keep the length between two and four pages, unless there are extremely special circumstances. People who spend a lot of time doing short-term contract work can have longer resumes, and people just entering the job market can have shorter resumes(SONY VAIO VGN-FZ31J Battery).

Overall, it is tough to properly highlight your technical skills and more than one position in the traditional one-page resume format. Two pages should be the baseline for any intermediate or senior developer. But after about four pages, the reader’s eyes start to glaze over. Much like your education, the experience you had more than seven or eight years ago is not terribly relevant, but the hiring manager does like to see an arc of increasing responsibility or project difficulty(SONY VAIO VGN-FZ31M Battery).

8: Properly document your history

Programming is not like most fields when it comes to employment history. For one thing, many programmers are contractors, which leads to an employment history that can look like a train. In addition, the dot-com bust is not too far behind us, and IT has always been an industry with a lot of bankruptcies, mergers, and acquisitions(SONY VAIO VGN-FZ31B Battery).

The problem is, no hiring manager likes to see a long list of short-term jobs. If your resume has a string of such jobs, with job titles that get bigger and bigger, you look like someone who has no loyalty. On the other hand(HP PAVILION DV6000 battery), if the jobs seem basically the same (or worse, get lower on the totem pole), it makes the reader think that you may simply be unemployable. If you have a legitimate reason for the short-term jobs, make sure that the reason is obvious. For example, mark the contracting/consulting positions clearly(SONY VGP-BPS13 Battery).

9: Don’t put the reader at legal risk

No hiring manager likes to be accused of prejudiced or discriminatory hiring. Not only is it unethical, but it is illegal. So hiring managers who are trying to do the job right will be familiar with the list of questions they can’t ask an applicant. Your part of the equation is to exclude this information from your resume(SONY VGP-BPS13B/B Battery). The hiring manager does not need to know your marital status, ethnicity, nation of origin, age, religion, or sexual orientation. There are a lot of other things the hiring manager does not need to know, either. If you include these irrelevant details on your resume, the hiring manager will feel scared and skittish. Leave these details out, please(ASUS EEE PC900 battery).

10: “What a geek!”

In high school, you may have hated being called a geek. But today, you are trying to find work as a programmer. “Geek” is “gold” to hiring managers. Find a way to show them that you are smart, love programming, and are constantly growing, learning, and exploring new ideas(Dell INSPIRON 1525 battery). Talk about your relevant hobbies if you have any, like contributing to open source projects or volunteering to teach local kids programming. Let them know if you like programming or computers enough to deal with them outside of work(Dell INSPIRON E1505 battery).

Wednesday, December 1, 2010

10 dumb things IT pros do that can mess up their networks

One of the most popular pastimes of IT professionals is complaining about the dumb things users do. We all get a laugh from articles like TechRepublic’s ultimate collection of dumb user stories. But if we’re honest, we have to admit that computer novices aren’t the only ones who make mistakes(Sony Vaio VGN-FZ battery). Most network administrators could (but probably won’t) tell you about their “most embarrassing moment.” That’s the one where you discover you accidentally misconfigured the firewall to shut down the boss’s Internet connection or that the backup you’ve been making every day has been copying the wrong files. Oops(Sony VGP-BPS13 battery).

Let’s take a look at some of the most common dumb things IT pros do that can mess up their networks — and how you can avoid making such mistakes yourself(Sony VGN-FZ150E battery).

1: Don’t have a comprehensive backup and disaster recovery plan

It’s not that backing up is hard to do. The problem is that it sometimes gets lost in the shuffle, because most network administrators are overloaded already, and backups are something that seem like a waste of time and effort–until you need them(Sony VGN-FZ15L battery).

Of course you back up your organization’s important data. I’m not suggesting that most admins don’t have a backup strategy in place. But many of those backup strategies haven’t changed in decades. You set up a tape backup to copy certain important files at specified intervals and then forget about it(Sony Vaio VGN-FZ18M battery). You don’t get around to assessing and updating that backup strategy — or even testing the tapes periodically to make sure your data really is getting backed up — until something forces you to do so (the tape system breaks or worse, you have a catastrophic data loss that forces you to actually use those backups) (Sony VGN-FZ180E battery).

It’s even worse when it comes to full-fledged disaster recovery plans. You may have a written business continuity plan languishing in a drawer somewhere, but is it really up to date? Does it take into account all of your current equipment and personnel? Are all critical personnel aware of the plan(Sony VGN-FZ17 battery)? (For instance, new people may have been hired into key positions since the time the plan was formulated.) Does the plan cover all important elements, including how to detect the problem as quickly as possible, how to notify affected persons, how to isolate affected systems, and what actions to take to repair the damage and restore productivity(Sony VGP-BPS15 battery)?

2: Ignore warning signs

That UPS has been showing signs of giving up the ghost for weeks. Or the mail server is suddenly having to be rebooted several times per day. Users are complaining that their Web connectivity mysteriously drops for a few minutes and then comes back. But things are still working, sort of, so you put off investigating the problem until the day you come into work and network is down(Sony VGN-FZ29VN battery).

As with our physical health, it pays to heed early warning signs that something is wrong with the network and catch it before it becomes more serious(Sony VGN-FZ11Z battery).

3: Never document changes

When you make changes to the server’s configuration settings, it pays to take the time to document them. You’ll be glad you did if a physical disaster destroys the machine or the operating system fails and you have to start over from scratch. Circumstances don’t even have to be that drastic; what if you just make new changes that don’t work the way you expected, and you don’t quite remember the old settings(Sony VGN-FZ220E battery)?

Sure, it takes a little time, but like backing up, it’s worth the effort.

4: Don’t waste space on logging

One way to save hard disk space is to forego enabling logging or set your log files to overwrite at a small file size threshold. The problem with that is that disk space is relatively cheap, but hours of pulling your hair out when you’re trying to troubleshoot a problem without logs to help you discover what happened can be costly, in terms of both money and frustration(Sony VGN-FZ11M battery).

Some applications don’t have their logs turned on automatically. But if you want to save yourself a lot of grief when something goes wrong, adopt the philosophy of “everything that can be logged should be logged(Sony Vaio VGN-FZ31Z battery).”

5: Take your time about installing critical updates

The “It’ll never happen to me” syndrome has been the downfall of many networks. Yes, updates and patches sometimes break important applications, cause connectivity problems, or even crash the operating system. You should thoroughly test upgrades before you roll them out to prevent such occurrences(Sony VGN-FZ19VN battery). But you should do so as quickly as possible and get those updates installed once you’ve determined that they’re safe.

Many major virus or worm infestations have done untold damage to systems even though the patches for them had already been released(Sony VGN-FZ11L battery).

6: Save time and money by putting off upgrades

Upgrading your operating systems and mission-critical applications can be time consuming and expensive. But putting off upgrades for too long can cost you even more, especially in terms of security. There are a couple of reasons for that(Sony VGP-BPS9/B battery):

New software usually has more security mechanisms built in. There is a much greater focus on writing secure code today than in years past(Sony VGN-FZ190 battery).

Vendors generally retire support for older software after awhile. That means they stop releasing security patches for it, so if you’re running the old stuff, you may not be protected against new vulnerabilities(Sony Vaio VGN-FZ21S battery).

If upgrading all the systems in your organization isn’t feasible, do the upgrade in stages, concentrating on the most exposed systems first.

7: Manage passwords sloppily

Although multifactor authentication (smart cards, biometrics) is becoming more popular, most organizations still depend on user names and passwords to log onto the network. Bad password policies and sloppy password management create a weak link that can allow attackers to invade your systems with little technical skill needed(Sony Vaio VGN-FZ210CE battery).

Require lengthy, complex passwords (or better, passphrases), require users to change them frequently, and don’t allow reuse of the same passwords over and over. Enforce password policies through Windows group policy or third-party products. Ensure that users are educated about the necessity to keep passwords confidential and are forewarned about the techniques that social engineers may use to discover their passwords(Sony VGN-FW11M battery).

If at all possible, implement a second authentication method (something you have or something you are) in addition to the password or PIN (something you know) (Sony Vaio VGN-FZ31J battery ).

8: Try to please all the people all of the time

Network administration isn’t the job for someone who needs to be liked by everyone. You’ll often be setting down and enforcing rules that users don’t like. Resist the temptation to make exceptions

It’s your job to see that users have the access they need to do their jobs — and no more(Sony VGN-FZ62B battery).

9: Don’t try to please any of the people any of the time

Just as it’s important to stand your ground when the security or integrity of the network is at stake, it’s also important to listen to both management and your users, find out what they do need to do their jobs, and make it as easy for them as you can–within the parameters of your mission (a secure and reliable network) (Sony Vaio VGN-FZ21J battery) .

Don’t lose sight of the reason the network exists in the first place: so that users can share files and devices, send and receive mail, access the Internet, etc. If you make those tasks unnecessarily difficult for them, they’ll just look for ways to circumvent your security measures, possibly introducing even worse threats(Sony VGN-FZ440N battery).

10: Make yourself indispensable by not training anyone else to do your job

This is a common mistake throughout the business world, not just in IT. You think if you’re the only one who knows how the mail server is configured or where all the switches are, your job will be secure. This is another reason some administrators fail to document the network configuration and changes(Sony VGN-FZ32 battery).

The sad fact is: no one is indispensable. If you got hit by a truck tomorrow, the company would go on. Your secrecy might make things a lot more difficult for your successor, but eventually he or she will figure it out(Sony VGP-BPS13B/B battery).

In the meantime, by failing to train others to do your tasks, you may lock yourself into a position that makes it harder to get a promotion… or even take a vacation(Sony VGN-FZ11E battery).

Tuesday, November 30, 2010

10 tips for remotely administering workstations

Relying on various technologies to remotely administer workstations can save you a significant amount of time and money. Here are some pointers to help you get the most out of remote administration tools and tactics(Dell INSPIRON 1520 battery).

1: Know thy hardware

You may feel as though you have ingrained knowledge about your inventory of workstations — but do you really know it? Having critical information available is imperative to being able to remotely administer the workstation through the life of a system. Consider the following factors(Dell INSPIRON 1420 battery):

Is USB 2.0 available on all systems?

Is there a DVD or CD drive? Can it write?

What boot sequence have you configured — and how do you change it?

What kind of connectivity back to your main back office is available?

Knowing the answers to these types of questions will make a big difference in many of the situations you’ll need to address in a remote administration role for workstations(Dell INSPIRON E1505 battery).

2: Identify client firewalls and configurations

If you have client firewalls in place, be sure you know what can and can’t be done. Determine where and by whom any tasks can be performed (and how to disable that). A good example would be trying to get a critical file or update to an application from an auto update mechanism or some other nonstandard source(Dell INSPIRON 1525 battery). While this “one-off” mechanism may sound simple enough, will all systems be able to access the update as expected?

3: Know thy network

Many large enterprises put rules in place for remote locations that do everything from limiting traffic amounts for each site to restricting what traffic can occur from the remote site to restricting MAC addresses that can connect on the remote site(SONY VGP-BPS13B/B Battery). For the plethora of tasks that are involved with remote administration of workstations, be sure to build your strategy around network traffic patterns that are permitted. Also know the procedure or parameters to get the permitted traffic changed if possible(SONY VGP-BPS13 Battery).

4: Memorize command-line tools to save time

For those of you who are dealing with low bandwidth connections, having your common administrative tasks memorized from a command line can save everyone’s time. For Windows XP systems, consider memorizing the following commands(SONY VAIO VGN-FZ31M Battery):

Compmgmt.msc — Computer Management MMC snap-in, a good hub of all types of information, including the Event Log, Device Manager, and Services.

Ipconfig — The TCP/IP configuration utility. Some common parameters include /release, /renew, /flushdns, and /registerdns(SONY VAIO VGN-FZ31J Battery).

Shutdown.exe — A tool to remotely reboot or shut down a system. With appropriate permissions, a system can be rebooted remotely as well.

Net Use — Can be used to map a drive, simply authenticate, or stop a mapping(SONY VAIO VGN-FZ31E Battery).

5: Make everything as centralized and singular as possible

When possible, have every element of your workstation infrastructure collected in one place and one instance. The last thing you want to have to worry about is a large number of little file servers scattered around your enterprise(Sony Vaio VGN-FZ31S battery). So for file storage, having remote users use the central resource is critical. That way, your backups and consistent security access policies are the same for your remote users as for your central users. Your IT costs will be lower and you’ll ensure that administration and access are controlled in one manner regardless of location(SONY VAIO VGN-FZ31z Battery).

A notable exception may be a large remote site with a number of users who may end up flooding the remote connection between the sites with consistent traffic. If you have a remote office that has, say, 40 people in it, a local file server may be appropriate, with backups occurring over the network(SONY VAIO VGN-FZ38M Battery), time and traffic permitting. By contrast, consider the example of a store, where you may have fewer than 10 users and only a few computers. In this situation, you want to do everything possible to keep the IT footprint low(SONY VAIO VGN-FZ210CE Battery).

6: Have Internet distribution mechanisms

For remote locations, consider going directly to the Internet instead of using the VPN or wide area connection. For instance, say you need to deploy a large service pack for the client operating system. If you are looking at a 300MB download for a handful of clients, deployment would not be possible on most remote connections(SONY VAIO VGN-FZ160 Battery). Certain client administration tools can manage distribution of packages over the Internet to help remote locations and laptop users while away from the central network. For example, when remote workstations (including laptops) are to receive their management packs through the Internet, iPass may provide the quickest download(SONY VAIO VGN-FZ21 Battery).

7: Line up alternate connectivity options

We all find ourselves using a tool in a primary fashion and being able to address 95% of our issues through that tool. For Windows XP, that would generally be Remote Desktop. But in the rare situation where you can’t use Remote Desktop to get to a client system, what do you do? Have alternate tools lined up to provide you access to your systems, as needed. Here are some examples(SONY VAIO VGN-FZ21m Battery):

DameWare –Offers push install and remove when done using Windows credentials over TCP/IP connection.

VNC — Good old trusty remote client, service driven. Maybe use for alternate connectivity and starting the VNC service as needed(SONY VAIO VGN-FZ18m Battery).

LogMeIn.com –Great offerings in Internet-to-client connectivity; works through most proxy configurations.

8: Ensure OS platform consistency

To effectively administer workstations remotely without your IT costs spiraling out of control, having a single platform is an absolute requirement. It is worth the pain of being late in implementing a platform to maintain your consistency for remote administration and support(SONY VAIO VGN-FZ11m Battery). (Between the lines, that means wait on Vista.) If a second platform is introduced, the landscape changes for the workstation administration team. Everything has to be done once for each platform. Along these lines, having a standard workstation hardware inventory also contributes to a more efficient IT organization(SONY VAIO VGN-FZ11z Battery).

9: Control scope

Okay, this is not really an administration technique, but for remote workstations, you have to manage what you agree to do as an administrator. Let’s say you have a number of remote offices for a small number of users whom you provide with standard equipment(SONY VAIO VGN-FZ11l Battery). This equipment inventory includes workstations or laptops, a laser printer shared for all local systems, and network connectivity for everything available at the central site. Inevitably, one day you get a question along the lines of, “Can we get this other printer that scans and faxes?” from the remote site(SONY VAIO VGN-FZ150E Battery).

This is a critical issue because the site is taking the scope out of what’s normal — and the support end will suffer because you, as an administrator, are responsible for drivers on this new device(SONY VAIO VGN-FZ190 Battery). You’ll also be stepping away from a consistent computing platform. Having scan and fax capabilities isn’t a bad thing — but the business needs to understand that asking for functionality outside of what’s normal costs money — and the costs become much more than just a $199 multi-function unit(SONY VAIO VGN-FZ460E Battery).

10: Don’t provide lesser support for remote users

Don’t let the remote users suffer. The dynamic for remote workstations is different from a centrally located user. There may not be another system to walk over to and use, there may not be someone readily available to perform a quick task for them, and there may be customers waiting(sony vgp-bpl9 battery). Users in locations without a local IT staff are really on there own in a lot of ways, and you don’t want them to feel that way about the technology. Providing good service from the administration side is important to the success of an IT organization(SONY vgp-bps9 battery).